Some images of the renovation and build-out of the new studio....

 

 

 

The new studio (above) before construction began

 

trenching new water lines

water lines and french drain being installed

first leg of water lines and french drain installed

 

 

 

The studio just prior to construction. Watch this page as more pictures are added of the renovation effort....

 

 

 

back to the about page....